You don't have javascript enabled. Good luck with that.
Pencarian
 Pengurasan Saluran Jalan Sadar IV Petojo Utara Rampung

Channel Draining on Jalan Sadar IV Petojo Utara Completed

The channel draining located on Jalan Sadar IV RT 06/04, Petojo Utara Sub-district, Gambir, which has been underway since August 8, Sunday (8/31), finally completed.

Hopefully, it can minimize flooding in the future

Gambir Sub-district SDA Executing Unit Head, M Imawan said the draining is conducted to anticipate flooding in the rainy season.

"Every day, we deploy 12 personnel to the location," he expressed, Monday (9/2).

Dirty Channel on Jalan Bina Marga Drained from Mud

He explained the channel is about 80 centimeters wide and 50 centimeters high with mud reaching 20 centimeters deep.

"In total, the channel long on two roadsides dredged is about 500 meters," he explained.

The work appreciation from one of the residents in RW 04, Petojo Utara Urban Village, Maulana.

"Hopefully, it can minimize flooding in the future," he hoped.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1707 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1478 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1334 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1118 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye814 personDessy Suciati